•  
  •  
  •  
Welcome to

Sai Guru Waterproofing

We are one of the leading Construction waterproofing company at Bengaluru, We created an edge over quality service in this business arena. We also provide comprehensive range of restoration and curative waterproofing services in addition to specializing in preventive waterproofing on newer construction. We provide our services with a foremost objective to offer international standard services at affordable price range effectively suitable to the clients.

Learn More

Services

Epoxy Tile Grouting

How to solve toilet leakages for existing structures,Here the right solution for New and existing structures. We offer world class technologies for toilets,Tile grouting plays a vital role in bathroom and wet areas, Tile gap filling with premium Epoxy material for toilet,kitchen, balconies and terrace. Epoxy tile Grouting techniques used for long lasting life and safer your structure of building.It prevents dampness ,leakages,Moisture at walls.This is leading updated waterproofing technique and solutions for toilets and wet areas leakage.All leakage issues could solve at this treatment method.

we offer services for New and existing structures.

If it is paper joint gaps at toilet have wider upto 3mm with wall cutter and apply with our own method epoxy technology
Leakage test will be given after waterproofing...

Area of Operation

Residential
Commercial and
Industrial Building wall and Flooring's

Learn More

Toilet Waterproofing For New And Existing Structure

How to construct toilets using New technologies of waterproofing,How to avoid water leakage at toilet, Here the right solution for Toilet leakage issues

The existing surfaces of toilet to be treated,the concrete surface must be clean and free from oil, Grease, paint, loose dust, mud and laitance.

Horizontal surfaces should not have curing agents or hardeners. Honeycombs should be hacked off to expose the concrete.

All chipping and loose particles should be removed, clean surface with water before repairing.

ANGLE FILLET

In existing RCC slab and parapet wall junction make grooves for coving with admixture following manufacture ratio, After applying NITOBOND on wet brick for fine Bonding.

ACRYLIC POLYMER LIQUID MEMBRANE

Membrane should be applied in two coats for horizontal surface.

The first coat of Membrane Brush Bond Acrylic reinforced polymer modified elastomeric dual component of 1:2 ratio with a proper roller or Brush ensuring that all surface of the concrete surface is covered.

Leave the first coat to dry. When the first coat is reasonably dry and can accept foot traffic without lifting off the material when stepped on. This would at least be 3 to 4 hours after the first coat application.

Over the first coat of applied Membrane roll or Brush second coat by Membrane of both 3mm thickness. Wait for the second coat Membrane to be dry at least over night or 3 hours minimum.

This methods avoids leakage at toilet and bathroom for long-lasting period.

Area of Operation

Residential
Commercial and
Industrial Buildings

Learn More

Expansion Joint Treatments for Buildings

How to avoid leakage at Expansion joints of building.Here the right solution for Expansion joint.

How To Repair Expansion Joints

There are two ways to repair expansion joints in concrete. The best way to repair them depends on the condition of the joint.

Damaged Expansion Joints

If the top of the expansion joint has cracks and spall marks, then the joint is starting to deteriorate. Whether they cause be from high traffic on the surface, water, or age, here is how to repair them:

1) First, clean out the expansion joint. Make sure it is free of debris, dust, and any other chemical or material that could prevent the repair material from properly adhering.

2) Fill the entire expansion joints, up to the surface and over the damaged areas, with the FS-90 Crack Repair Kit.

3) Allow it to cure completely, about an hour, then re-cut your expansion joints – make them about ¾” deep.

4) Install a backer rod then dispense the JFX-35 Joint Filler over the backer rod and completely fill in the joint.

Normal Expansion Joints

If the top of the expansion joint is fine and you are simply looking to repair the expansion joint (if the expansion joint has a crack within the joint at the bottom, you can use these instructions as well) then you need to do the following:

1) First, clean out the expansion joint. Make sure it is free of debris, dust, and any other chemical or material that could prevent the repair material from properly adhering.

2) Fill in most, but not all, of the expansion j oint with the JFX-35 Joint Filler. If a backer rod was installed, it is okay to fill the joint entirely.

Learn More

Damp course treatment and Rising dampness

Damp course treatment for dampness and seepage at internal wall.Rising dampness issues solved by damp course treatment.Rising dampness arise above skirting tile of lower wall.its due to capillary action.

Learn More

High Performance Terrace Waterproofing

Do you have terrace water leakage problem.Here the right solution for terrace leakages at Existing structures .Acrylic liquid Membrane can be applied by using brush or roller over the entire surfaces of terrace after fine surface preparation.liquid Membrane should be applied in two coats for horizontal surface of terrace.

Acrylic reinforced polymer modified Elastomeric dual component of 1:2 ratio with a proper roller or Brush ensuring that all surface of the concrete surface is covered. complete leakage solved at this method of waterproofing.

How to solve leakage at terrace for existing structures.

Existing cracks should get repaired before chemical coating, Then
Acrylic reinforced polymer modified Elastomeric dual component of 1:2 ratio with a proper roller or Brush ensuring that all surface of the concrete surface is covered. complete leakage solved at this method of waterproofing.


we offer services for Terrace waterproofing for Both New and Existing structures.

leak check will be given after installation and guarantee provided for 7 years.

Area of Operation

Residential
Commercial and
Industrial Buildings

Learn More

Planter Box And Water Bodies Waterproofing

How to construct Planter box using New technologies of waterproofing,How to avoid water leakage at water bodies and planter box, Here the right solution for leakage issues and to construct safe

The existing surfaces of water bodies to be treated,the concrete surface must be clean and free from oil, Grease, paint, loose dust, mud and laitance.

Horizontal surfaces should not have curing agents or hardeners. Honeycombs should be hacked off to expose the concrete.

All chipping and loose particles should be removed, clean surface with water before repairing.

ANGLE FILLET

In existing RCC slab and parapet wall junction make grooves for coving with admixture following manufacture ratio, After applying NITOBOND on wet brick for fine Bonding.

ACRYLIC POLYMER LIQUID MEMBRANE

Membrane should be applied in two coats for horizontal surface.

The first coat of Membrane Brush Bond Acrylic reinforced polymer modified elastomeric dual component of 1:2 ratio with a proper roller or Brush ensuring that all surface of the concrete surface is covered.

Leave the first coat to dry. When the first coat is reasonably dry and can accept foot traffic without lifting off the material when stepped on. This would at least be 3 to 4 hours after the first coat application.

Over the first coat of applied Membrane roll or Brush second coat by Membrane of both 3mm thickness. Wait for the second coat Membrane to be dry at least over night or 3 hours minimum.

After dry protective plaster of 12 mm required.

This methods avoids leakage at toilet and bathroom for long-lasting period.

Area of Operation

Residential
Commercial and
Industrial Buildings

Learn More

Pressure Grouting / Injection Grouting

How to strengthen my wall at defected area,How to plug leak at wall,Here the ultimate solution

In existing RCC surface weak area and honey combs should be thoroughly checked to fix Nozzles, Drilling with 18mm bit by drilling machine up to length 36mm, fix nozzles of 18mm dia and seal around the pipe with Rapid setting Renderoc plug and allow to dry minimum 4 hours.

Pressure Grouting with CEBEX100 grout material at ratio of 225gm/50kg cement/20lit of water to be added up to flow able consistency. Thorough mixing and grout with pressure grouting machine upto honey combs get filled, seal the nozzle with FOSROC RENDEROC PLUG to avoid mixture getting out.

Allow 4 hours to dry and cutting the projected nozzles and seal it with FOSROC CONPEXTRA GP2. Make surface smooth with grinding machine after dry.

Operation Area
Retaining walls,Water tank,swimming pool,defected walls,column and pillar

Learn More

Cool Coating for terrace

Cool coat for existing roof to reduce temperature up-to 15 degree.Fantastic results giving by sai guru waterproofing Team

Learn More

Projects

My projects - My Assests

We always make sure that your problem is resolved effectively, that's why 70% of our new clients are referrals!

Our Services

Our Client